top of page
IMG_7479.HEIC

If your well is delivering less water, it can probably be recovered.

In most cases, we achieve recoveries exceeding 70%.

Has your well lost flow?

Progressive loss of performance is the most frequent problem in agricultural and industrial wells.

Pipe clogged by iron seizures

Mineral inclusions

Biofouling

Biofouling

Deep well covered

Filter clogging

WhatsApp Image 2026-02-20 at 5.12.11 p.m. (1).jpeg

We don't do generic cleanings.

We perform technical diagnostics.

Before intervening, we performed the following:
  • Internal inspection video

  • Structural assessment

  • Chemical analysis of water

  • Level measurement

  • Flow measurement

This allows us to apply the specific treatment according to the real cause of the problem.

We apply the appropriate technique according to the diagnosis.

Depending on the case, we use:

  • Air-Lift

  • Chemical cleaning

  • Mechanical brushing

  • Piston

  • Forced development

  • Pump removal and inspection

Not all cleanings are the same.

IMG_0173.jpeg
IMG_0258.jpeg

What can you expect?

• Flow recovery (often greater than 70%)
• Improved hydraulic stability
• Reduction of pumping effort
• Extended system lifespan

Preventive maintenance program

For agricultural and industrial projects, we offer scheduled maintenance plans to avoid performance losses and reduce major interventions.

This opens the door to recurring contracts.

Lipieza Loncoche.png

Real case study – Well recovery in Lanco

The following images correspond to the same well, at the same depth.

Screenshot 2026-02-20 at 6.20.03p.png
Before cleaning

The initial inspection reveals:

• Continuous slot filter completely clogged
• Evident presence of biofouling
• Water with high turbidity
• Clogging that significantly reduces the absorption capacity

This condition causes a progressive loss of flow, increased pumping effort, and decreased hydraulic efficiency.

Screenshot 2026-02-20 at 6.41.33p.png
After rehabilitation

After diagnosis and application of specific treatment:

• Filter completely clear
• Biofouling removal
• Completely crystal clear water
• Recovery of the system's capture capacity

The intervention allowed the hydraulic performance of the well to be restored without the need to drill a new one.

TELL US ABOUT YOUR PROJECT

bottom of page